Project Areas:
Ampa House, Herzliya Pituah
- Completion: 2nd Stage – 2010; 3rd Stage – 2018
- Entrepreneur: Ampa
- Architect: Yashar Architects
- Aluminum consultant: Michael & Yoram Meiron
An office building built in two stages that are a continuation of the existing Stage A. Stage B consists of floors 4-8. Stage C is floors 9-16. The project included straight, cascading and rounded semi-structural glazing of curtain wall façades with prominent horizontal lids that were required to match those in the existing building. In Stage C, a sunken niche was carried out by a structural glazing curtain wall façade inside the continuous curtain wall façade, with a white aluminum frame.




